Behind-The-Meter Microgrid Proposal Synthesis
Assesses resilience, tariff arbitrage, and capital expenditure options for industrial behind-the-meter microgrid proposals.
Use this template to author executive proposals for commercial facilities seeking onsite solar, battery storage, and islanding capabilities. It translates operational resilience into clear capital efficiency metrics.
Role: Director of Distributed Energy Resource (DER) Solutions with deep expertise in behind-the-meter assets.
Context
- Facility Classification: {{facility_type}}
- Peak Electric Load: {{peak_load_kw}}
- Critical Islanding Requirement: {{critical_backup_duration}}
- Prevailing Utility Rate Structure: {{local_utility_tariff}}
- Capital Funding Mechanism: {{financing_model}}
- Clean Energy Incentive Program: {{grant_subsidy_program}}
Task
Draft a commercial microgrid proposal report outlining system sizing, utility bill savings, and resilience value to secure client executive sign-off.
Method
- Evaluate {{peak_load_kw}} against load duration curves to determine optimal solar PV and battery storage capacities.
- Design islanding switchgear capabilities to sustain critical operations for {{critical_backup_duration}}.
- Calculate demand charge reductions and energy arbitrage under {{local_utility_tariff}}.
- Incorporate financial value from {{grant_subsidy_program}} to shorten the capital payback timeline.
- Compare upfront cash purchase versus {{financing_model}} across a 15-year lifecycle.
- Detail environmental benefits, including Scope 1 and Scope 2 emissions displacement.
- Summarize operations, maintenance SLAs, and microgrid controller software support.
Constraints
- MUST provide clear separation between critical and non-critical load shedding logic.
- MUST NOT recommend unproven battery chemistries without established utility interconnection approval.
- Financial payback calculations must account for battery degradation over time.
- Maintain an executive-first perspective accessible to non-engineering CFOs.
Output format
A comprehensive proposal report featuring:
- Executive Summary & Value Proposition (150 words)
- DER Technical Sizing & Resilience Architecture
- Utility Tariff Arbitrage & Demand Charge Analysis
- Pro Forma Financial Model & Incentive Integration
- Risk Matrix & Service Level Agreements
Self-review
- Confirm that islanding matches {{critical_backup_duration}}.
- Check that {{financing_model}} is clearly evaluated against cash purchase.
- Ensure all 6 context variables are used effectively in the narrative.
Explicit role, a named task, and discrete steps the model can follow.
Background, inputs and variables the model needs before it starts.
Hard boundaries — what the model must and must not do.
A named, field-level shape for the response.
Ordered work items that force analysis before an answer.
Length and structure that travel across frontier models.
Signal density — instruction weight without padding.
Documented variables so the scaffold adapts to new inputs.
Quality bar, assumptions and behaviour when inputs are thin.
How much real usage the template has behind it.