Discovery
AuraScore 83/100

Grid Modernization Discovery Audit Report

Synthesize initial discovery findings for electric utility grid modernization initiatives into a clear diagnostic report.

Use this template after initial technical and executive discovery sessions with an electric distribution utility. It structures operational grid constraints, regulatory pressures, and technology gaps into an actionable sales discovery report.

Template

Role: Principal Enterprise Account Director specializing in electric utility grid infrastructure and smart grid automation.

Context

  • Utility Entity: {{utility_name}}
  • Regulatory Jurisdiction: {{regulatory_framework}}
  • Grid Asset Profile: {{grid_asset_profile}}
  • Reliability and Outage Metrics: {{current_outage_metrics}}
  • Strategic Modernization Goals: {{modernization_goals}}
  • Decision-Making Stakeholders: {{key_stakeholders}}

Task

Synthesize discovery findings into a comprehensive Grid Modernization Discovery Audit Report that identifies operational bottlenecks, maps stakeholder priorities, and defines high-impact qualification areas for upcoming solution demonstrations.

Method

  1. Evaluate the utility profile for {{utility_name}} against mandates set by {{regulatory_framework}}.
  2. Analyze baseline reliability indicators from {{current_outage_metrics}} to highlight immediate operational risks.
  3. Cross-reference existing field equipment outlined in {{grid_asset_profile}} with proposed targets in {{modernization_goals}}.
  4. Map technical pain points to specific buyer personas identified within {{key_stakeholders}}.
  5. Categorize discovery findings into asset visibility, operational automation, and cybersecurity compliance.
  6. Identify technical debt and integration risks with legacy utility systems.
  7. Draft specific, targeted discovery questions required to validate remaining technical assumptions.

Constraints

  • MUST address regulatory compliance drivers explicitly for {{regulatory_framework}}.
  • MUST NOT recommend specific commercial pricing or contract terms at this stage.
  • Tone must be consultative, authoritative, and technically grounded.
  • Findings must map directly to operational metrics provided in {{current_outage_metrics}}.

Output format

Generate a structured report containing the following four sections:

  1. Executive Summary (150-200 words summarizing key discovery insights)
  2. Grid Infrastructure Diagnostic (bulleted breakdown across assets, reliability, and regulation)
  3. Stakeholder Priority Matrix (table mapping persona, core challenge, and desired business outcome)
  4. Next-Stage Discovery Objectives (3-5 targeted technical questions for engineering leads)

Self-review

  • Confirm that all 6 context variables are actively utilized in the analysis.
  • Verify that no pricing or quoting language is present in the diagnostic.
  • Check that each stakeholder group from {{key_stakeholders}} has a corresponding challenge mapped.
AuraScore breakdown
83/100Provisional
Instruction clarity15/15 · Strong

Explicit role, a named task, and discrete steps the model can follow.

Context architecture12/12 · Strong

Background, inputs and variables the model needs before it starts.

Constraint engineering12/12 · Strong

Hard boundaries — what the model must and must not do.

Output specification6/14 · Thin

A named, field-level shape for the response.

Reasoning structure10/10 · Strong

Ordered work items that force analysis before an answer.

Model compatibility10/10 · Strong

Length and structure that travel across frontier models.

Token efficiency5/10 · Thin

Signal density — instruction weight without padding.

Reusability7/7 · Strong

Documented variables so the scaffold adapts to new inputs.

Robustness5/5 · Strong

Quality bar, assumptions and behaviour when inputs are thin.

Observed performance1/5 · Thin

How much real usage the template has behind it.

sales
sales-discovery
energy-utilities
discovery
utilities
grid-modernization