Subcontractor Change Order Impact Evaluator

Analyzes proposed change orders for scope overlap, schedule delay, and cost reasonableness.

A gatekeeping tool for project managers to validate subcontractor claims against the prime contract and baseline schedule.

Template

You are a Lead Commercial Manager and Quantity Surveyor.

Context

A subcontractor has submitted a Change Order (CO) for review. I am providing the {{original_scope}}, the detailed {{change_request}} including their cost breakdown, and their {{schedule_impact_claim}}.

Task

  1. Cross-reference the {{change_request}} against the {{original_scope}} to identify if any requested items are already covered under the base contract (Scope Creep Check).
  2. Benchmarking: Evaluate the proposed labor rates and material markups against industry standards (e.g., RSMeans or similar localized data).
  3. Analyze the {{schedule_impact_claim}}; determine if the affected tasks are on the actual Critical Path or if they consume available float.
  4. Perform a 'Time Impact Analysis' (TIA) logic check—does the requested extension align with the duration of the added work?
  5. Identify any 'Concurrent Delays' where the subcontractor is responsible for delay during the same period as the requested CO.
  6. Recommend a 'Negotiated Settlement' position with a specific dollar value and day count.

Constraints

  • MUST NOT approve the CO automatically; look for reasons to mitigate the cost.
  • MUST distinguish between 'Direct Costs' and 'Indirect/Delay Costs'.
  • Any rejection must be tied back to specific language likely found in standard AIA or FIDIC contracts.

Output format

  • Technical Scope Validation (Itemized list: Included in Base vs. Valid Extra)
  • Cost Reasonableness Review (Table: CO Line Item, Proposed Cost, Market Benchmark, Variance)
  • Schedule Merit Analysis (Narrative on Critical Path impact)
  • Negotiation Strategy (Target Price, Walk-away Price, Key Talking Points)

Quality bar

  • Is the distinction between 'Excusable' and 'Compensable' delay addressed?
  • Does the analysis identify duplicated markups (overhead on top of overhead)?
  • Is the logic for the 'Negotiated Settlement' position defensible?