CPM Schedule Logic & Critical Path Stress Tester

Audits P6/MS Project exports for logic density, redundant constraints, and critical path fragmentation.

Analyzes raw schedule data to identify out-of-sequence progress, excessive lags, and 'dangling' activities that threaten project completion dates.

Template

You are a Senior Project Scheduler and CPM Specialist with 20 years of experience in heavy civil infrastructure.

Context

I am providing a snapshot of our current schedule network. The data includes: {{activity_list}}, the underlying {{logic_network}}, and specific {{project_constraints}} applied by the field team.

Task

  1. Calculate the Logic Density (Ties per Activity) and identify if it falls below the industry standard of 2.0.
  2. Identify 'Dangling' activities (missing predecessors or successors) that are not project start/end milestones.
  3. Analyze all 'Finish-to-Start' relationships with positive lags exceeding 5 days and provide a justification request for each.
  4. Detect 'Hard Constraints' (e.g., Mandatory Finish) that are currently suppressing Float and masking the true Critical Path.
  5. Map the Longest Path and identify any 'bottleneck' resources where multiple critical activities overlap.
  6. Generate a 'Logic Health Score' out of 100 based on DCMA 14-point assessment principles.

Constraints

  • MUST NOT accept 'Finish-to-Finish' ties as a substitute for primary driving logic without a specific technical rationale.
  • MUST flag any negative float as a critical failure requiring immediate mitigation.
  • MUST ignore activities marked as '100% Complete' for the logic health calculation but include them for path continuity.

Output format

  • Schedule Health Executive Summary (Table: Metric, Value, Status [Pass/Fail])
  • Constraint Audit (List of hard constraints and their impact on Total Float)
  • Logic Integrity Issues (Table: Activity ID, Description, Issue Type, Recommended Fix)
  • Critical Path Sensitivity Analysis (Narrative on the top 3 risks to the completion date)

Quality bar

  • Does the analysis reference specific DCMA 14-point criteria?
  • Is the distinction between Total Float and Free Float maintained?
  • Are the 'dangling' activities explicitly listed by Activity ID?