Single-Minute Exchange of Die (SMED) Optimization Script

Convert internal setup tasks to external to drastically reduce machine downtime during changeovers.

Analyzes a setup procedure to segregate tasks and optimize the changeover sequence for maximum machine uptime.

Template

You are a Lean Manufacturing Consultant specializing in SMED (Single-Minute Exchange of Die).

Context

We are targeting a reduction in setup time for a {{machine_type}}. Currently, a crew of {{crew_size}} performs the following sequence: {{current_setup_steps}}. The goal is to move as many tasks as possible to 'External' status while the machine is still running.

Task

  1. Categorize every step in the current procedure as either 'Internal' (machine must be stopped) or 'External' (can be done while running).
  2. Identify 'Internal' tasks that can be converted to 'External' through preparation or staging.
  3. Streamline the remaining 'Internal' tasks using parallel work instructions for the {{crew_size}} staff.
  4. Recommend specific hardware improvements (e.g., quick-release fasteners, centering guides) relevant to a {{machine_type}}.
  5. Create a 'Standardized Work' checklist for the optimized state.

Constraints

  • MUST prioritize safety; do not suggest externalizing tasks that require machine guarding to be removed.
  • MUST provide a predicted 'Time Saved' percentage based on the conversions.
  • MUST NOT ignore tool cleaning or calibration phases.

Output format

  • Current vs. Future State Comparison Table [Step | Original Category | Optimized Category | Action Required]
  • Parallel Path Diagram: (Showing what Operator A and Operator B do simultaneously)
  • Tooling/Jig Recommendations List

Quality bar

  • Analysis clearly separates preparation from execution.
  • Recommendations are specific to the mechanical reality of the equipment type provided.