Software Workload Cloud Migration Assessment Matrix

Score and categorize legacy enterprise software workloads into a multi-dimensional cloud migration matrix.

Use this template when planning an infrastructure transition from on-premise legacy architectures to modern cloud platforms. It provides structured risk, complexity, and migration pathway scores.

Template

Role: Lead Cloud Solutions Architect with 15+ years guiding large-scale enterprise modernization and cloud adoption frameworks.

Context

  • Enterprise Client: {{enterprise_name}}
  • Legacy Workloads: {{legacy_workloads}}
  • Target Cloud Environment: {{target_cloud_provider}}
  • Regulatory Compliance: {{compliance_standard}}
  • Migration Window: {{migration_timeframe}}
  • Downtime Constraint: {{downtime_tolerance}}

Task

Produce a workload migration assessment matrix for {{enterprise_name}} that analyzes {{legacy_workloads}} across architectural readiness, security posture, and business criticality to recommend specific 6-R migration pathways into {{target_cloud_provider}}.

Method

  1. Analyze the functional architecture and dependency graph of each component in {{legacy_workloads}}.
  2. Evaluate regulatory obligations and security requirements enforced by {{compliance_standard}}.
  3. Quantify data storage volumes, network latency sensitivity, and statefulness for every workload.
  4. Score each application on migration complexity, technical debt, and business risk (scale of 1-5).
  5. Map each system to a definitive 6-R strategy (Rehost, Replatform, Refactor, Repurchase, Retain, or Retire).
  6. Account for {{downtime_tolerance}} during cutover window sequencing.
  7. Assign each workload to an implementation phase within {{migration_timeframe}}.

Constraints

  • Matrix rows MUST cover every application provided in {{legacy_workloads}}.
  • Migration recommendations MUST fully comply with {{compliance_standard}} parameters.
  • You MUST NOT assign 'Refactor' without explicitly noting architectural dependencies in the notes column.
  • Use standardized 6-R terminology exclusively for migration strategies.

Output format

1. Assessment Criteria Definition

A four-point scoring rubric explaining Risk, Complexity, Business Value, and Readiness metrics.

2. Workload Migration Decision Matrix

A Markdown matrix formatted with the following headers: | Workload Name | Architectural Type | Compliance Risk (1-5) | Complexity (1-5) | Business Criticality (1-5) | 6-R Strategy | Target Service ({{target_cloud_provider}}) | Migration Wave |

3. Migration Sequencing Plan

A structured phase-by-phase breakdown (Phases 1 through 4) detailing workload cutovers against {{migration_timeframe}} and maintenance windows.

Self-review

  • Ensure every component in {{legacy_workloads}} has an assigned 6-R strategy.
  • Verify target cloud services match native offerings of {{target_cloud_provider}}.
  • Confirm cutover sequencing stays within {{downtime_tolerance}} limits.
AuraScore breakdown
79/100Provisional
Instruction clarity15/15 · Strong

Explicit role, a named task, and discrete steps the model can follow.

Context architecture12/12 · Strong

Background, inputs and variables the model needs before it starts.

Constraint engineering10/12 · Adequate

Hard boundaries — what the model must and must not do.

Output specification6/14 · Thin

A named, field-level shape for the response.

Reasoning structure10/10 · Strong

Ordered work items that force analysis before an answer.

Model compatibility10/10 · Strong

Length and structure that travel across frontier models.

Token efficiency5/10 · Thin

Signal density — instruction weight without padding.

Reusability7/7 · Strong

Documented variables so the scaffold adapts to new inputs.

Robustness3/5 · Adequate

Quality bar, assumptions and behaviour when inputs are thin.

Observed performance1/5 · Thin

How much real usage the template has behind it.

business-strategy
business-planning
technology-software
cloud migration
cloud architecture
infrastructure